Client: Arab Potash Company

Overview:

Our certified welders and applicators completed welding and painting tasks at the APC site, ensuring top-notch quality and precision.

Project:

Supplying 24″ welded carbon steel pipes with flanges, accessories, and painting works.

1- Supplying:

Kinetics provided 3 km of 24” pipes, flanges, bolts, and nuts adhering to the following standards:

2- Welding Works:

Pipe flange joints were connected using the Shielded Metal Arc Welding (SMAW) method. Fillet and back welds ensured strong, secure joints. Each weld underwent rigorous inspection before, during, and after welding using Penetration Testing to ensure quality and integrity.

3- Painting Works:

The pipes received a thorough blasting and a three-layer epoxy coating, totaling DFT 400 Micron:

Conclusion

This project exemplifies Kinetics’ commitment to delivering high-quality industrial solutions tailored to our clients’ specific needs. From the precision in supplying materials to the expertise in welding and painting, every step was executed with meticulous care. The result is a robust, durable piping system ready to support APC’s operations efficiently and sustainably. At Kinetics, we’re proud to set the standard for excellence in the industrial supplies and solutions sector.

Get In Touch :
Contact Us :